Profiling and Polishing Motors Calibration

Profiling and Polishing Motors Calibration2:30 minLa version française sera disponible prochainement. This section explains and describes the steps to follow to calibrate the position of the profiling and polishing motors/spindles. Refer to the sub-section that...

Profiling Tool Rack Calibration

Profiling Tool Rack Calibration1 minLa version française sera disponible prochainement. The U-Sensor must be previously mounted and calibrated. Manually remove all abrasive tools from the tool holder racks. Set them aside during this operation. Install the supplied...

Profilometer Calibration

Profilometer Calibration3 minLa version française sera disponible prochainement. The calibration of the laser sensors is done in two steps. The first step consists in physically aligning the 2 heads to superimpose the acquisition planes. The second step automatically...

RX Calibration

RX Calibration2 minLa version française sera disponible prochainement. Rx calibration consists of moving to a defined target and calculating the height until the corner of the block is detected. The detection of the corner goes through the same function as the...

Compliance System Calibration

Compliance System Calibraton2 minLa version française sera disponible prochainement. Profiling motors have a unique compliance system, allowing force to be applied from one side only. To measure or adjust the force applied by the compliance system, follow the steps...

Files and Folders

Files and Folders1:30 minLa version française sera disponible prochainement. Computer Description Files/Folders Instructions Folder to visualize the part CAD. C:\AV&R\BrainWave\data\models\ Folder of old and unnecessary CAD can be deleted. Folder of products...

Fanuc Robot – Regular Inspections

Fanuc Robot: Regular Inspection2:30 minLa version française sera disponible prochainement. Performing daily and periodic inspection enables the sensors to maintain stable performance for a long period. The periodic inspection items for the sensors are listed below:...

Fanuc Robot – Check Points

Fanuc Robot: Check Points1 minLa version française sera disponible prochainement. Confirmation of Oil Seepage

Robot Fanuc – Maintenance

Robot Fanuc: Maintenance3 minLa version française sera disponible prochainement. Replacing the Batteries (1-Year Periodic Inspection If Built-in Batteries Are Specified)(1.5-Year Periodic Inspection If External Batteries Are Specified) The position data of each axis...